Saturday, March 10, 2018

Day Two Of The March 2018 Quilting Retreat

Today I got most of the quilting done on the quilt that I posted yesterday. Later on in the day, I switched to a mystery table runner that we were all working on. I had a date with Jack the Ripper (seam ripper) after I sewed rows in the wrong order. After much picking, the rows are ready to be reassembled tomorrow.

No comments:

Mug Rug By Linds H.

Linda was in a mug rug exchange, so she created this one. It turned out larger than it was supposed to be, so she'll be constructing a s...